Latest News & Projects From Conquip Cantideck
Heyrod Construction
We are a Concrete Construction Company that has used Conquip Industrial for both hires & purchase. We have found Conquip Industrial to be reliable and very competitive on pricing. The hire equipment is well maintained and fully certified, and all equipment arrives on site within the agreed time scales.
On a number of contracts we have also had cause to use the CantiDeck loading platforms which have been delivered, assembled and fixed into the building with minimal disruption to our site operations. Training is given to our staff by qualified Conquip engineers who leave our staff fully conversant with the re-positioning and installation of the platforms.
Dave Smith, Plant Manager
Project: Thames Water Ring Main Shaft Excavation
Problem faced: 
Morgan est faced constant failure and down time of their equipment owing to the excessive weight of the London Clay being excavated, compounded by a safety hazard when manually discharging a full skip. Time on this project was at a premium so Morgan est needed to find a solution...and quickly...
Solution:
Conquip Industrial were approached with the problem and asked how to resolve. Many questions were faced regarding the operational site, its restrictions, load type and capacity and the need to have safe handling and safe discharge facilitates. The standard product was not considered an option for this role; it was going to take something special.
The Conquip team took their 6000 litre boat skip and gave it a complete makeover in design and build, adding a re-designed bale arm together with additional supports to take extreme weight and harsh working conditions...
Result achieved within 10 days!
Conquip Industrial took instruction, delivered a new design and manufactured boat skip that provided safe handling and discharge meeting with H&S requirements, together with a faultless performance and gave training - all within 10 days! The 1045 / 6000H boat skip increased productivity by 20% regaining lost time and bringing the project in a head of time.
A very happy, very safe and very productive client...

Project: A681 Cloughfoot
Problem faced:
Bentley needed a quick response to massive problem. Had the JCB but no bucket, needed a special within 24 hours...
Solution:
A call to Conquip Industrial came up with the answer. A special 8mm thick steel bucket was sourced requiring a 2.2m width and a massive 1 cubic meter capacity.
Conquip delivered to site within the critical time frame...Job Done...
Result:
Very happy customer who now picks up the phone to Conquip first and goes nowhere else...

Project: The Great West Quarter Brentford
Problem faced:
High profile project working to extreme time scales to complete and faced with large quantities of concrete pouring. J Reddington was looking for a product that was rugged in construction, durable, had 3000 Ltr capacity easy to control, and safe to do the job...

Solution:
It takes someone special to design and manufacture a Concrete Column Skip to take 3000 Ltr of concrete. WOW!! what a beast, but nothing phases the design team at Conquip. As we show, the unit was designed, manufactured and on the truck in record time, ready to meet the harsh environments of the Great West Quarter.
That's what makes Conquip Industrial a special company to do business with, a team of experts that can advise, help and support you all the way...
Result:
A satisfied customer who will always look to Conquip Industrial for that special requirement...

Project: Multiple Site H&S Requirement
Problem Faced:
Sometimes things go wrong, and when it does, you may need a special stretcher cage that gets your injured work colleague out of the area and to the ground in a safe manner. The standard stretcher cage with end access has always proved to be the best answer.
However, M J Gallagher wanted something a little special that would enter at floor level, with an entry on solid ground rather than flush to the building together with room for medical support to be moved with the injured.
Solution:
Conquip looked to the problem and designed a complete new stretcher cage to meet with the client's needs. The inverted tee shape design gives a central lift and allows safe access from the building at floor level. Nothing else like it, designed, manufactured and prepared in corporate colours.
Result:
A real special that meets with Health and Safety legislation plus a bit more and a tough challenge, but nothing can beat the Conquip team!
International Markets Growing By The Day
BREAKING NEWS: October 2009
Conquip CantiDeck 16 x crane loading platforms on their way to Malaysia.
BREAKING NEWS: October 2009
Conquip Industrial signs their first distributor for Qatar. First orders in house and concrete column skips are heading their way...
BREAKING NEWS: October 2009
Conquip Industrial signs their first distributor for Australia.
Home and European Markets
BREAKING NEWS: October 2009:
After 18 months of Research and Development the long awaited Conquip CantiCrane has arrived. Built with safety in mind and ease of operation the CantiCrane has already received huge interest both in home markets but also internationally. Built by experts in crane design the CantiCrane is going to complement the CantiDeck crane loading platform plus much more. It's lifting technology in its own premiere league.
.
BREAKING NEWS: October 2009
Conquip Industrial strengthens their relationship with SPEEDY ASSET SERVICES.
Speedy Asset Services and Conquip Industrial become a winning team on the 2012 Olympic Park.